Countertop replacement planning
Elite Countertop Inc. plans countertop replacement, fabrication and installation for qualified Southern Ontario projects. Start with photos of the existing space.
A Rough Estimate is preliminary and non-binding. Completed onsite measurement and confirmed removal/trade scope are required before a Formal Quote.
Existing countertop, cabinets, backsplash and fixtures reviewed together
Removal, disposal and trade coordination confirmed rather than assumed
Project access, location and travel considerations reviewed individually
Whether the existing surface is laminate, granite, quartz or another material, clear photos help identify questions that should be discussed before scope or pricing is confirmed.
Clear next steps
Share wide photos plus seams, edges and wall connections.
Note desired material, fixtures and any removal questions.
Use the preliminary scope to identify unresolved work.
Complete onsite measurement before a Formal Quote.
Planning detail 01
The current surface can hide details that matter once replacement work begins.
Photograph seams, corners, exposed edges and wall connections.
Note visible cabinet damage or uneven areas.
Show appliances and panels that meet the countertop.
Planning detail 02
Do not assume removal, disposal or trade coordination is included. These items need explicit confirmation.
Ask who is responsible for existing countertop removal and disposal.
Confirm plumbing and electrical coordination separately.
Plan how the space will be protected and accessed.
Planning detail 03
A replacement is a useful time to review fixtures and the transition between countertop and wall.
Decide whether the existing sink may be reused or replaced.
Photograph the current backsplash and any wall damage.
Share faucet and cooktop details when openings may change.
Prepare without overthinking it
Removal, disposal, plumbing, electrical work and backsplash scope are not assumed. They must be confirmed for the specific project before a Formal Quote.
Common project questions
Removal and disposal are not assumed. Responsibility, timing and scope must be explicitly confirmed for the specific project.
Possible fixture reuse depends on the fixture, condition, cabinet, opening and confirmed project scope. Share model information and photos for review.
Plumbing and electrical work are not included by assumption. Any required trade coordination must be confirmed separately before the Formal Quote.
Yes. Visible cabinet condition and level concerns should be identified early, then verified onsite before replacement scope is confirmed.
Continue exploring the planning process or review what the estimate request will ask for.
Start with what you know
Photos, approximate measurements and a simple sketch can help begin a preliminary estimate conversation. Final pricing requires confirmed details.